Chatham
Chatham is the main bay and Head Office of the Company.
It has a 150M alongside wet berth within a basin alleviating any tidal restrictions whereby ships may dock for full refits.
The Chatham facility is a fully comprehensive repair and manufacturing facility encompassing all equipment required for full Ship Repair Projects.
Lock gate to enter the basin – Maximum length (LOA) 139 meters, maximum beam 22 meters and maximum draft 8 meters.
OHS700097
FS691383