From Fabrication to Delivery — A Large-Scale Lifting Frame - Part 2

With such a large object travelling on the road, we had to plan the transportation carefully and contact the police to make them aware of the movement.

From Fabrication to Delivery — A Large-Scale Lifting Frame - Part 1

We recently had a regular customer come to us with a challenging requirement — the fabrication of a large bespoke lifting frame to assist with loading a ship.

Steelwork taking shape in Loughton, Essex

Another project progressing well in Loughton, Essex, with the structural steel package now taking shape.

Flood Gate Frames Replaced by EAPL Southampton

Out with the old and in with the new!

A Busy Summer at EAPL Peterlee

It has been a busy and successful summer for our offices and workshop in Peterlee, with a wide range of projects completed for both our loyal customers and newly acquired clients.

EAPL Completes Bespoke Vessel Platform Project

EAPL recently secured a project with a new customer to manufacture a bespoke steel platform for new office facilities onboard a vessel.

Steel Structures Fabricated and Delivered by EAPL

EAPL was recently awarded a contract by a new customer to fabricate a range of steel structures in accordance with customer-supplied drawings and specifications.

EAPL Delivers Crane Stopper Fabrication Project

EAPL was recently appointed by a new customer to fabricate a number of crane stoppers, providing a complete service from material procurement through to final delivery.

Bespoke Steel Railings for Abridge Village Hall Playground

EAPL was commissioned to manufacture and install a complete set of bespoke steel perimeter railings for the children's play area at Abridge Village Hall in Romford.

Specialist Marine Welding in Challenging Conditions

Challenging environments demand more than just technical skill—they require precision, experience, and a strong commitment to safety.

Structural Steel Package Delivered to Reading

Another structural steel package safely delivered to the Reading area.

Bulkhead Plating Renewal Underway

On a project like this, the sequence is every bit as important as the steel.

Piling Pipe Welding Project Completed

Following a referral from an existing client, EAPL was contracted by a new customer to provide welding services for a piling pipe project.

Digital Surveying Enhances Project Planning

At EAPL we like to get the lay of the land; capturing accurate existing conditions to support safe planning, coordination, and efficient delivery on site.

Rural Telemetry Hut Upgrade Completed

Our install team don’t have a bad view on site sometimes. This photo captures EAPL Southampton’s Installation team’s rural workplace, they were completing flooring and desk works inside a Environment Agency telemetry hut.

Trestle Restoration Works Underway at Purfleet

EAPL has embarked on Phase 3 of the scope of works for Heidelberg Materials UK at the Purfleet depot.

Stainless Steel Access Solution Completed

Our team has recently fabricated and installed this custom stainless steel access staircase, providing a durable, corrosion resistant solution for a demanding industrial environment.

Proof Load Testing Completed Onboard Vessel

Alongside EAPL's diverse range of engineering services, we also provide Proof Load Testing and LOLER Thorough Examinations for lifting equipment.

Flood Gate Replacement Begins at Avon Outfall

Today marks the start of our latest project in Keyhaven, where EAPL Southampton are replacing the flood gates at Avon Outfall.

EAPL Team Works Through the Heatwave

Hot hot hot! ☀️While many are keeping cool indoors, the EAPL team are out on site working through the heatwave, carrying out welding, grinding, and other essential project works.

Cargo Hold Bulkhead Removal – Part 1

The project involves the removal and replacement of cargo hold bulkheads in accordance with the stringent requirements of both the client and the naval architect.

Short-Notice Demobilisation Successfully Delivered

EAPL was instructed to undertake a large-scale demobilisation project at very short notice.

Custom Steel Railing Project Completed in Notting Hill

Our latest bespoke metalwork project took us to the workshop to complete the fabrication of a custom steel railing system for a residential property in Notting Hill.
Bespoke Steel Fabrication & Marine Installation Project

Bespoke Steel Fabrication & Marine Installation Project

Our team recently completed a specialist steel fabrication and installation project onboard a working vessel, delivering a bespoke structural support frame designed and manufactured to meet the operational requirements of the client.

Steel frame, supplied, fabricated, and galvanised in Brighton

For this residential property in Brighton, we supplied and fabricated a bespoke steel frame system to replace the existing exterior timber framework surrounding the bay window elevation.
Steel Tower Replacement Project Completed

Steel Tower Replacement Project Completed

EAPL attended site as part of an ongoing project. Under this scope of work, EAPL was instructed to replace and repair the existing steel towers, as the original steelwork was no longer structurally compliant.
Steel Fender Bar Replacement Completed in Hull Dry Dock

Steel Fender Bar Replacement Completed in Hull Dry Dock

EAPL was contracted to provide platers and welders for dry dock repairs in Hull, involving the replacement of worn steel fender bars located on the aft port and starboard sections, as well as around the stern of a tug vessel.

Insert Plate Repairs Restore Vessel Bulkhead

EAPL recently completed specialist bulkhead repairs using precision-fabricated insert plates and certified welding to restore the vessel’s structural integrity.

Structural Steel Fabrication Project Completed in Tonbridge

We recently completed a bespoke structural steel fabrication project in Tonbridge. Our team carried out a site survey and fabrication drawings to ensure all measurements and fabrication details were accurate before production commenced.

New Crane Seating Fabricated and Installed

EAPL was commissioned by a long-standing client to manufacture new crane seating, based on detailed drawings provided by the customer.

Jetting Plough Prepared for Shipment to Brazil

An exciting and unique project for the team at EAPL Southampton to get involved in.

Cracked Ship Gangway Repaired and Reinstalled

EAPL was called upon to support a range of urgent repair works, including the repair of a cracked ship’s gangway.

Drag Head Repairs Completed for Valued Client

EAPL was once again selected by a valued customer to carry out essential repairs to a drag head, reinforcing our reputation for quality workmanship and dependable service.

Damaged Pier Panels Replaced and Restored

EAPL were trusted to carry out essential repair works on damaged pier panels. The project involved the careful removal of worn and damaged sections, followed by the fabrication and installation of new replacement panels designed to meet the required specifications.

Bespoke Cranked Steel Frame Delivered in Wokingham

EAPL have recently completed a structural steel project in Wokingham, delivering a bespoke cranked frame with partially galvanised components.

Replacing Flood Gates for The Environment Agency

EAPL Southampton was approached by the Environment Agency to replace flood gates that had become worn out over time. The gates, due to prolonged use, were no longer functioning effectively.

EAPL Peterlee Completes Custom Wailing Beams for Client

EAPL Peterlee was commissioned to produce seven wailing beams, each ranging from 6 meters to 10 meters in length, for an ongoing client project.

Steel Goal Post Frame Fabrication in Caterham

We recently completed the fabrication of a steel goal post frame for a project in Caterham, delivering a high-quality structural solution tailored to the client’s requirements.

Peterlee - Supplying Material Gangway

At EAPL’s workshop in Peterlee, a long-standing client approached the team with a specific request for a custom project.

Steel and Support Frames Local Hospital

EAPL recently completed a project at a local hospital, supplying bespoke galvanised steel brackets and support beams for the creation of a green wall on the side of a multi-storey car park.

Southampton Local Community

As part of EAPL Southampton supporting the local community, Marchwood Scout Troop were given the opportunity to learn about the principles of mechanics, looking at how the engine works and basic repairs.
eap ltd

Top 50 fastest-growing companies in Kent

We’re thrilled and incredibly proud to be recognized as one of the top 50 fastest-growing companies in KENT!

Small Projects. Same Commitment.

Small projects remain an important part of how EAPL supports its long-standing and valued customers. No matter the size of the job, we apply the same focus on quality, turnaround, and customer service.

Phase 1 Steelwork Completed for Ramsgate Development

Our team is proud to deliver the early stage works for a new build development for one of our long-standing and valued clients, Olive & Oak Homes.
Sea Fastenings Removed from Wind Farm Tower Vessel

Sea Fastenings Removed from Wind Farm Tower Vessel

At Siemens River Berth in Hull, our team recently completed a key operation involving the removal of sea fastenings from a Wind Farm Tower vessel.

No Job Too Small

EAPL were contracted by an returning client to relocate a life raft on deck.

Sea Water Valve Overhaul Completed

Further work has been successfully completed on seven sea water valves.

Precision 3D Modelling and Fabrication Detailing

Alongside our structural steel packages, EAPL provides fully detailed 3D models and comprehensive fabrication drawings, capturing every required bolt, hole, plate, weld, and connection needed for manufacture and installation.

EAPL Invests in 10,000 sq ft Workshop Upgrade

Over the last 12 months and since the move from berth 5 to our new factory, EAPL have been investing to upgrade our 10,000 square foot workshop to ensure we provide all clients with exceptional quality products within the timescales required at highly competitive prices.

Engine Room Pipework Extended and Reconnected

EAPL was requested by a long-standing client to attend site and inspect pipework within the engine room that had been installed too short and, as a result, was not connected to the engine water cooler.

Light Weight Jetting Plough Contract Awarded

EAPL has been awarded the contract to build a Light Weight Jetting Plough for ETA Subsea Cable Specialists.

Engine Room Pipework Modified and Installed

EAPL was called out to one of our regular customers to carry out modifications to existing pipework in the engine room.
Staircase

Custom Steel Staircase Fabricated In-House

As part of ongoing improvements to our fully equipped workshop, we recently designed and fabricated a custom steel staircase to enhance access and operational efficiency.

Steel Fabrication Completed for JCB Wash Plant

EAPL recently completed a steel fabrication project for a JCB wash plant cleaning facility. This involved cutting, shaping, and welding steel components precisely to meet the facility's operational needs.

Welcome Sali Alnajar to the EAPL Team!

Please join us in welcoming Sali Alnajar as the newest member of the EAPL team at our Chatham office.
Stern Door Repair

Manufacturing of Ship Stern Doors

Learn how EAP Ltd replaced damaged hinge cover plates using precision-cut DH36 steel, expert welding, and chamfer finishing for a high-quality, ready-to-install solution.

Steel Support Structure Restored

Heidelberg Materials UK appointed EAPL to undertake a highly detailed and complex project involving the repair and installation of sectional steel beams to restore the structure to full compliance.

Rotten barrier out. New posts in.

EAPL fabricated two replacement posts with custom hinges, installed them, secured them, and set them in concrete. No job too small-details matter.

Platform Assembly and Installation Completed in Portchester

EAPL Southampton was called to a project in Portchester to assemble and install a platform for a production facility.

EAPL is proud to sponsor Boldon Ladies FC

We extend a heartfelt thank you to the team. We wish them all the best in the upcoming season!

EAPL Supports Piling Operations for Knights Brown

EAPL Southampton were proud to be assisting Knights Brown at their site in Lymingon.

Tyre Fenders and Brackets Installed at Greenwich Jetty

EAPL Southampton were commissioned to design, fabricate, and install new tyre fenders, along with securing brackets at Day Aggregates’ jetty in Greenwich.

Old Control Box Replaced with New Fabricated Unit

EAPL was requested to attend a customer’s vessel to remove an old, rusted control box.

Emergency Electrical Fault Resolved on MSC Ingrid

EAPL’s electrical team responded to an emergency callout aboard the MSC Ingrid after an onboard electrical fault prevented the vessel from departing.

Fender Replacement Project Completed for Woolwich Ferry

EAPL has successfully completed the removal and replacement of 15 fenders at the Woolwich Ferry terminal. The project involved installing seven new fenders on both the Northside and Southside, along with a face fender on the mooring pontoon.

Steel Plates Installed to Protect Trackside Bund Wall

EAPL Southampton secured another project with Day Group following the successful completion of a similar job at their Battersea site.
EAPL successfully carries out the replacement of four fairleads on the vessel, TOR BOREAS.

Fairlead Replacement and Modifications Completed on Tor Boreas

EAPL successfully carries out the replacement of four fairleads on the vessel, TOR BOREAS.

Cargo Deck Plate Removed and Replaced by EAPL

EAPL is proud to have supported A&P Falmouth in the removal and replacement of the cargo deck plate, facilitating access for the repair of dump valves for a valued client.

Fender Brackets Fabricated and Installed for Ferry Terminal

EAPL is proud to have once again earned the trust of a valued and long-standing client, securing a new project that highlights our continued commitment to quality and reliability.

Ongoing Pipework Modifications Completed in Peterlee

Following the continued success of recent pipework modifications and repairs, EAPL has completed further works, including the alteration of an impact pipe and the cutting of new pipes to specified lengths.

Demonstrating Commitment Through Every Job - No Matter the Scope

As shown in the accompanying photo, the heater’s hot air baffle plate had developed a crack that required immediate attention.
marine

Overnight Sheet Piling Removal

EAPL successfully secured the contract for the removal of 96 metres of sheet piling.

Marine Drag Head Rebuilt Using Hardox Steel

EAPL was recently commissioned to carry out the renewal and modification of a drag head for one of our main clients.

Steel Delivery Success Builds on Previous Project

Building on the success of a previous structural steel delivery, EAPL Chatham was once again entrusted with supplying and delivering steel to a site in the SW5 area of London.

CMS Repair Southampton

The unit pictured is a Shore Supply Cable Management System (CMS), used to connect cruise ships to shore-side power at Southampton Cruise Terminal.

A Huge Congratulations to Karen on 10 Years of Service!

All of us at EAPL would like to extend our heartfelt congratulations to Karen at our Southampton office on reaching an incredible milestone—10 years of dedicated service!

Emergency Pipework Installed for Vessel Departure

EAPL responded promptly to an urgent request to install a new steam pipe for a plate cooler on the vessel ‘Waverley’.

Emergency Gangway Repair and Replacement by EAPL

EAPL responded to an emergency request to perform a temporary repair on a damaged ship gangway, which had been rendered inoperable.

Rapid Structural Steel Beam Supply in London

At EAPL, we recently completed a fast-turnaround steel fabrication project in Southwest London, supplying and fabricating 47 structural steel beams with just a 3-day lead time from order to delivery.

Bespoke Box Frame Installed for Home Renovation

At EAPL, we recently completed a bespoke box frame installation for a residential property, supporting a major structural modification as part of a home extension and renovation project.
Rapid Turnaround on Structural Steel Box Frame for Rear Extension

Rapid Turnaround on Structural Steel Box Frame for Rear Extension

A recent project in our dedicated workshop saw the successful fabrication and supply of a structural steel box frame for a rear extension.

EAPL Delivers Bespoke Metering Drum Solution

EAPL Secures Project for Custom Metering Drum Design and Fabrication.

Flange and Pipe Modification

Another project demonstrating our commitment to customer satisfaction.

Cabin support frame and walkway

EAPL Delivers Precision-Engineered Cabin Support Frame and walkway for Day Aggregates.
Emergency Callout to Anvil Point Vessel

Emergency Callout to Anvil Point Vessel

Emergency Callout to Anvil Point Vessel. EAPL responded to an emergency callout aboard the Anvil Point.
Dredge Pipes

EAPL Delivers Dredging Pipe Upgrades

EAPL was contacted by a long-standing client to carry out modifications on several dredging pipes.
The EAPL team recently completed a custom fabrication project at our Southwest facility.

Storage Solution for Hazardous Materials

The EAPL team recently completed a custom fabrication project at our Southwest facility.

Bilge Pump Replacement and Pipework Installation

Following instructions from the ship's staff, EAPL was tasked with replacing two outdated bilge pumps along with the associated pipework.
Ballast Pipe Repair

Ballast Pipe Repair Hull

EAPL was called to repair a leaking ballast pipe located in the engine room.
EAPL Responds to Vessel Collision Damage

EAPL Responds to Vessel Collision Damage

EAPL promptly responded to a vessel that sustained shell plate damage following a collision.
Fender Repair

EAPL Delivers Rapid Repairs

Swift emergency repairs demonstrate EAPL’s adaptability.

EAPL’s Ongoing Partnership with Countrystyle

EAPL is proud to have supported Countrystyle Recycling as a valued long-term partner for over six years. It has been an honour to meet their operational needs and contribute to their continued success.

EAPL Designs and Installs Bund Netting System

EAPL was once again proud to support a long-standing customer, delivering a full-service solution from concept to completion.

Rudder Emergency

Once again, EAPL has proven its competence to respond swiftly and effectively in high-pressure situations.

Southampton Chute and Hopper Replacement

Out with the Old, In with the New. Our Southampton team was proud to support a long-standing client, Day Aggregates, with a recent upgrade project.

Car Boat Ferry Tilbury Docks 

EAPL reaffirmed its reputation for a rapid and effective response during a critical scenario.
Seawater Valves

Seawater Valve Rebuild

Another routine task completed in a timely manner within our fully equipped workshop.

Southampton Flood Alleviation Project

EAPL has once again proven its capabilities by successfully delivering a critical Environment Agency flood alleviation scheme.

Multiple Tasks Aboard the Hartland Point

EAPL recently attended the vessel Hartland Point to carry out a series of three distinct tasks.

Precision Cleaning with Ultrasonic Technology

EAPL is proud to showcase our ongoing cooler cleaning project, utilising our state-of-the-art Ultrasonic Cleaning Tank.

Waste Pipe Modifications

EAPL was requested to attend the site to remove a waste pipe that had deteriorated over time, becoming thin and worn, and requiring replacement.
Capstans Electrical Work Southampton UK

EAPL Delivers Time-Critical Capstan Installation Project

Further highlighting EAPL’s industry of expertise, Knights Brown appointed EAPL to manufacture and install new capstans at the ABP Solent Gateway.
Celebrating 20 Years of Success

Celebrating 20 Years of Success

European Active Projects Ltd Marks Milestone Anniversary
Ship Fan Trunking Removal and Replacement

Ship Fan Trunking Removal and Replacement Works

EAPL was commissioned by Coldham Insulation Ltd to dismantle, remove, and replace the ship's fan trunking.
EAPL successfully fabricated and installed two ballast crane foundations for the vessel Ulisse.

Ballast Crane Foundations Installed on Ulisse

EAPL successfully fabricated and installed two ballast crane foundations for the vessel Ulisse, operated by Prysmian.
At the customer's request, EAPL performed work on the Fire Main system aboard the vessel. The required pipes were fabricated and TIG welded, with internal purging carried out during the root run.

Fire Main Repair and Testing by EAPL

At the customer's request, EAPL performed work on the Fire Main system aboard the vessel. The required pipes were fabricated and TIG welded, with internal purging carried out during the root run.
eapl Southampton

EAPL Responds to Urgent Call to Support MV Eleonora

EAPL Responds to Urgent Call to Support MV Eleonora. Our skilled marine electricians were promptly dispatched to inspect and repair faults in the vessel’s shipboard alarm systems.

EAPL Delivers High-Quality Brackets for Multi-Site Project

EAPL was awarded a contract to manufacture and deliver brackets for multiple sites. All brackets were fabricated in our workshop and underwent weld testing to ensure quality.
Tee Mezzanine Deck Fabrication

Mezzanine Deck Fabrication

EAPL successfully fabricated three mezzanine decks at our Tees workshop. Each component was carefully marked and cut to size to ensure a precise fit within the vessel.
EAP Ltd Pile mod

Pile modification supply and install

EAPL attended site for a long-standing customer, to supply and install a more durable material for the pile modifications.

Granite Removal from Vessel-Mounted Plough

EAPL attended the vessel to remove granite that had become lodged in the plough that is mounted to the vessel.

Emergency Steam Pipe Repair at Oil Processing Plant

EAPL responded to an emergency call at an Oil Processing Plant to address a leak in the heating steam pipework. A new section of pipe was fabricated and installed by EAPL to resolve the issue, allowing the system to be restored with minimal downtime.
Fabrication of Discharge Hopper for Tarmac

Fabrication of Discharge Hopper for Tarmac

EAPL recently had the pleasure of fabricating a discharge hopper for one of our clients. The fabrication was completed in our fully equipped facility at the Tees department.
Biffa Ipswich

Lifting Biffa Ipswich's Maintenance Needs

Since the plant was commissioned the team at Biffa Ipswich have struggled with moving parts and equipment up onto the plant and around the walkways for maintenance activities.

Emergency repair of Chem Stella

Proud moment! We received fantastic feedback from our Liverpool partners on the recent emergency repair of Chem Stella.
Gangway Stacker Falmouth

Gangway Stacker Falmouth

EAPL has successfully completed a ship gangway stacker for a valued partner in Falmouth, meeting high industry standards and precise specifications.
Woolwich Ferry Grid Repairs – Successfully Delivered by EAPL

Woolwich Ferry Grid Repairs – Successfully Delivered by EAPL

We are pleased to announce the successful completion of essential repairs to the Woolwich Ferry Grid (South Terminal), commissioned by Transport for London (TfL). Following a rigorous tender process, EAPL secured the contract and commenced work on 17th February 2025.
Dredging Bucket Working

Dredging Bucket Working

Once again, we have been able to help our client minimise vessel downtime. Its great to see the dredging system back in action.
Staircase Fabrication

Staircase Fabrication

We're pleased to have completed the fabrication of a new staircase for one of our clients.
Deck Insert

Deck Insert

We've recently completed the insertion and welding of a new deck insert as per our client's specifications.
Shell Repair Tees

Tees Shell Repair

We've recently completed significant repairs to a vessel that sustained substantial shell damage after striking rocks on the seabed.
Bucket Refurb Peterlee

Bucket Refurbishment – Peterlee 

Our Peterlee facility recently received 10 steel buckets that were either worn or damaged. Each of these buckets underwent thorough refurbishment and was expertly painted in our workshop before being promptly returned to the client.
Bulkhead and Deck Inserts

Bulkhead and Deck Inserts

Deck, Coaming, and Bulkhead Plate Inserts. All welds undergo 100% MPI testing and have passed. Approved BV plate and Lloyd's Grade A plate provided by EAPL.
Another successful mobilisation at Dover Port by EAPL!

Another successful mobilisation at Dover Port by EAPL!

Facing tight deadlines, our expert team quickly overcame initial challenges, ensuring swift preparation, thorough safety assessments, and efficient welding operations alongside port staff.
Walkway bridge construction in Liverpool

Walkway Bridge in Liverpool

Walkway Bridge Fence designed, made and installed by EAPL
Meet EAP Ltd's new Managing Director In the latest edition of Energy Focus, we introduce the newly appointed Managing Director of European Active Projects Limited.

Meet the new Managing Director at European Active Projects Limited!

In the latest edition of Energy Focus, we introduce the newly appointed Managing Director of European Active Projects Limited.

European Active Projects Ltd and A&P Falmouth in Energy Focus

A&P Falmouth, a valued, long-standing partner of European Active Projects Limited, is featured in the latest Energy Focus for their innovative £12M Shore Power Project - the UK's first multi-vessel flexible shore power connection, driving marine decarbonisation.
EAPL Southampton building bridges with the Environment Agency

EAPL Southampton building bridges with the Environment Agency

EAPL was asked to fully refurbish and strengthen an existing vehicle access bridge that had been unusable for over 4 years

EAPL provides rapid support 

Our Peterlee facility mobilized four welders within 12 hours and travelled to Liverpool to undertake a mobilization job aboard two Jack up barges.

Petrol Tank Modification Works

Upgrade works on petrol tanks 11, 11X, 12, 12X, 13, 13X, 14, 15, 16, 17, 18Y, 18X and 18 at Ricardo Site in Shoreham. Provide development, design, procurement, manufacture and installation labour for enlarged bespoke manways into tanks and new ATEX rated fill and vent lines.
To support Boskalis in reclaiming around 500 tons of sand from Sandbar, located around 20 miles out to sea and rebuilding the shore beach that has eroded over the last 30 years.

Boskalis, Colwyn Bay Project

EAP Ltd supported Boskalis in reclaiming around 500 tons of sand from Sandbar, located around 20 miles out to sea and rebuilding the shore beach that has eroded over the last 30 years.