Fire Main Repair
and Testing by EAPL
At the customer's request, EAPL performed work on the Fire Main system aboard the vessel. The required pipes were fabricated and TIG welded, with internal purging carried out during the root run.
Following fabrication, the pipes underwent pressure testing at 7.5 bar. Finally, the sections were joined together and connected to the vessel using stainless steel Straub couplings.