Pile modification
supply and install
EAPL attended site for a long-standing customer, to supply and install a more durable material for the pile modifications.
They attended the site and installed the material using Nylon and UHMWPE (Ultra-High Molecular Weight Polyethylene). The intention was to see what material would have higher durability.


Get in touch with EAP Ltd
If you have a question or need a quote you can send us a quick message using the form below and we will come back to you.









