Pile modification
supply and install

EAPL attended site for a long-standing customer, to supply and install a more durable material for the pile modifications.


They attended the site and installed the material using Nylon and UHMWPE (Ultra-High Molecular Weight Polyethylene). The intention was to see what material would have higher durability. 

Get in touch with EAP Ltd

If you have a question or need a quote you can send us a quick message using the form below and we will come back to you.

Contact

menu-circle